You as a product designer can prevent changes from impacting your production and cost once it’s in manufacturing. We’ll talk about it from a contract manufacturer’s perspective, and give you insights that we see on a common basis that will help you streamline your manufacturing process.
Chris is the co-founder and Chief Product Officer at MacroFab. With over 20 years in technology development and leadership, he has started and led companies in the SaaS, Robotics, and Manufacturing spaces.
Solutions for Every Role and Team
Discover and evaluate design options earlier
Develop in one shared workspace
Scale with control and compliance
Connect every stage of hardware development
Learn More
Equip engineers with everything needed to design modern, high-performance PCBs.
Combine advanced PCB design with cloud-based collaboration to streamline development.
Faster design-to-production handoff with your contract manufacturer.
Centralize DFM reviews and packages to accelerate PCB production handoff.